SAMI JASSIM
Company Profile
Siemens KSA Projects
Saudi Aramco –Reverse Osmoses Unit Booster Gas Compression 3&5 Saudi Arabia SIEMENS KSA
System Components:
Siemens Step7 V5.5, TIA Portal V13 SP1Upd9, WinCC Comfort SP1, Siemens S7-414H PLC System, Redundant
I/O and Touch Panel.
Responsibilities: Established redundant communication with Step7 and WinCC Comfort (TIA Portal).
Established the communication of redundant I/Os with redundant (S7-414H) PLC using
Redundant CGP Library V5.2.
Established the redundant Modbus RTU communication as slave with Yokogawa DCS
as master using CP441-2.
Complete engineering and factory acceptance test.
Test and changes the control logic according to the control philosophy of the project.
Responsibilities:
Saudi Aramco –Shaybah RIC Expansion Project Upgrade of Existing STP Saudi Arabia SIEMENS KSA
System Components:
Siemens Step7 V5.5, WinCC Flexible, Siemens S7-414H PLC System and Touch Panel (MP 377 15 inch).
Responsibilities: Sewage Treatment Plant (STP) consist of MOVs, FCVs, Pumps, SD motors, DD motors,
VFDs, Totalizes, Flow Meters, control with S7-414H PLC with Touch Panel.
Completed the Commissioning successfully (loop test, Logic and Operational Conditions
tested).
Established the Modbus Communication.
TCP/IP redundant communication between S7-414H PLC as master with VFD as slave.
Test and changes the control logic according to the control philosophy of the project.
Responsibilities:
Saudi Aramco –Hasbah Arabia Project II Arabia SIEMENS KSA
System Components:
Siemens PCS7 V8.2, TIA Portal V13 SP1Upd9, Siemens S7-414H S7400 FH ESD System, Redundant I/O and
Touch Panel.
Responsibilities: Established redundant communication with Step7 and WinCC Comfort (TIA Portal).
Established the communication of redundant I/Os with redundant (S7-414H) PLC using
Redundant CGP Library V5.2.
Page 8 of 10
Established the Modbus RTU Communication.
Replication of Plate Farms and factory acceptance test.
Test and changes the control logic according to the control philosophy of the project.
On site commissioning.
Responsibilities:
Saudi Aramco – Aramco Manifa & Haradh RTU SCADA SIEMENS KSA
System Components:
Siemens PCS7 V8.2 Telecontrol, Siemens TIM Based RTU.
Responsibilities: Establishing a Communication of New RTUs in the Severs.
Addition of Signals in the Existing RTU and addition in the DBA.
Test and changes the control logic according to the control philosophy of the project.
On site commissioning.
Responsibilities:
Saudi Aramco – Aramco Abqaiq Community Services Addition of PCV RTUs SIEMENS KSA
System Components:
Siemens PCS7 V 7 Telecontrol, Siemens TIM Based RTU.
Responsibilities: Establishing a Communication of New RTUs in the Severs.
Addition of Signals of New RTU and addition in the DBA.
Test and changes the control logic according to the control philosophy of the project.
On site commissioning and Start Up.
Local RTU Testing.
Touch Screen programming.
RTU Programming
Responsibilities:
SPCC (Southern Provence Cement Co.) JIZAN Saudi Arabia SIEMENS KSA
System Components:
Siemens PCS7 V8.1 SP1, TIA Portal V13 SP1 Upd9, WinCC Comfort, Siemens S7-410H PLC System, S7-300 and
Cemat Library V8.0.
Responsibilities: Integration of Automation Stations, Engineering Stations, Servers and Clients by using PCS7 V8.1 SP1.
Developed HMI for Crusher Area, Raw Mill Area, Pre Heater Area, Cooler Area, Stacker Area and Packing Area.
Involved in Pre Factory Acceptance test and Factory Acceptance Test.
Engineering for the Packer area convert relay logic into PLC logic.
Responsibilities:
MEFSCO –Dora Dora Project Saudi Arabia SIEMENS KSA
System Components:
Siemens PCS7 V8.1 SP1,ABB AC-450 PLC, Siemens S7-410H PLC System and CM-104 communication device.
Responsibilities: Integration of Automation Stations, Engineering Stations, Servers and Clients by using PCS7 V8.1 SP1.
Established the communication with ABB AC-450 PLC to S7-410H PLC through CM-104 device using MB-300
protocol.
Testing the Motor, MOV and FCV with S7-410H PLC Communicating with ABB AC-450 PLC using CM-104
device.
Responsibilities:
Hadeed SPLP Upgradation Saudi Arabia SIEMENS KSA
System Components:
Siemens TIA Portal V13 SP1 Upd9, Siemens S7-300 and Touch Panel KTP700.
Responsibilities: Following are the tasks i.e. successfully managed during Engineering and Commissioning of the Hadeed SPLP
Upgradation Project.
Hardware engineering involving preparation of schedule and functional logic and control diagrams.
Software Engineering and testing in TIA Portal for S7 300.
Developed HMI for KP700 establish communication with S7-300 PLC.
Responsibilities:
SAUDI ELECTRICITY COMPANY (SEC) POWER PLANT JIZAN Saudia Arabia ABB KSA
SEC Power Stations consists of 50MW supplied by General Electric Gas Turbine unit, 132kV GIS,
Step-up transformer, 132kV XLPE cables, auxiliary transformers and MV switchgears.
ABB 800xa System, 20 RTUs, EWS, Servers, PGIM.
Ovation (Emerson system), Cimplicity (General Electric System), Triangle IEC101.
Troubleshooting of the system in coordination with SEC, IICS and ABB Switzerland.
SAUDI ELECTRICITY COMPANY (SEC) POWER PLANT TIHAMA, Saudia Arabia ABB KSA
- ABB 800xa Hardware related tasks, troubleshooting, Panel Diagnosing.
- Established communication between remote terminals (Westermo Modems).
- Complete Engineering, Alarming, Graphics, Workplace of Tank Protection.
REPLACEMENT OF ESP AND ATS OF STG-1 STEAM UNITS AT RABIGH PP ABB KSA
The Control, Operation & monitoring of ESP Transformer Rectifier, Rapper Vibrator and Ash transport system
is presently envisaged through Microprocessor. Currently, I am working on the PLC based Automation system
that offered sufficient to perform all the functions in accordance with the process requirements.
AC500 – PM 592-ETH.
Control builder 2.3.0, Freelance V 2016.
Complete Engineering Logics, Operational Conditions and designing of HMI.
COMMUNICATION OF SCADA WITH ABB AC500 PLC RABIGH ABB KSA
- Communication testing and configuration of Communication between ABB AC500 PLC with SCADA.
NATIONAL WATER COMPANY TGW SR16 RESERVOIR AL-RIYADH, ABB KSA
SR16 Reservoir located in al-Riyadh near Makah road. the project consists of 12 tanks,34 valves, flow meters’ level
sensors, level switches,4 pumps and chambers valves also consist of chlorination room.
ABB Control Builder Plus V2.3, Wonderware SCADA System V10.1, ABB AC500 PM 591-ETH Redundant
System & PM 573 ETH
Developed HMIs, Performed Pre – Factory Acceptance Test and Factory Acceptance Test and now doing
testing and commissioning at site.
Testing and changes the control logic according to the control philosophy of the project.
Establish communication between PLC and remote I/Os through CS31 BUS Protocol.
Establish OPC communication between PLC PM 591 and Wonderware SCADA System.
Controlling and resolving the issue with the Clients (DHONGO, TYPSA and NWC).
SAUDI ARAMCO SIEMENS INTERFACE WITH DEISEL GENERATOR
- Established communication between SIEMENS S7400H System with Diesel generator using
Modbus TCP/IP using the existing Hardware CP443 for all the 10 Pump Stations. - Complete Engineering, Alarming, Graphics and SAT.
HADEED Steel Plant, Al – Jubail (Kingdom Of Saudi Arabia) under SIEMENS K.S.A
- HMI up-gradation of Arc Furnace from SIEMENS COROS, LSB / LSC to the State
Of Art SIEMENS HMI, Win CC (Version – 6.0). - HMI up-gradation of Bag House from SIEMENS COROS, LSB / LSC to the State
Of Art SIEMENS HMI, Win CC (Version – 6.0).
Bulk Fuel Plants (Kingdom Of Saudi Arabia) under SIEMENS K.S.A
Software engineering involving PLC programming of SIEMENS SCADA CS7
system at SIEMENS AG Karlsruhe for Bulk fuel plant fuel handling and dispatch
system automation.
East – West Pipe Line (Kingdom Of Saudi Arabia) under SIEMENS K.S.A
Complete revamp of 1500 KM Oil & Gas pipe line both 48’’ and 56’’, originates
from Al- Abgaig to Jeddah having 11 pumps – stations and 1 pressure –
reducing station. Each station has 5 turbines. The new SCADA system is based
on CS7 and S7 400H controllers ESD used is ICS Triplex.
Saudi Aramco - Khurasaniya (Kingdom Of Saudi Arabia) under SIEMENS K.S.A
Complete commissioning of SIEMENS, SINAUT based SCADA system
comprising of 92 RTUs with S7 317 and CS 7 as base station with FEP servers.
Shuqaiq Water Transmission System, Al – Khobar (Kingdom Of Saudi Arabia) under SIEMENS
Provide services to our client including as-built drawing; create signal list, cable list,
and panel list including station control block diagram.
DR-1 Dhahran to Riyadh Oil Pipeline (Kingdom Of Saudi Arabia) under SIEMENS
- Up-gradation of an Existing Oil Pipeline from Dhahran to Riyadh. System
Design and Software Engineering of Process Control System (PCS 7) Based. - Siemens SCADA System CS7.
- Siemens S7-400 Redundant Controller.
- Siemens Emergency Shutdown (ESD) System Quad log.
DR-2 Dhahran to Riyadh Oil Pipeline (Kingdom Of Saudi Arabia) under SIEMENS
- System Design and Software Engineering of Automation and Process Control
System for Shipping Facilities Transporting Refined Oil Products from Dhahran
To Riyadh. - Siemens Process Control System PCS 7.
- Siemens S7-400 Redundant Controller.
- Siemens Emergency Shutdown (ESD) System Quad log.
References
Mr. Fazal Abbas,
Manager Engineering,
Industrial Solutions & Services, Oil / Gas and IT Solutions
Industrial Solutions & Services, Oil / Gas and IT Solutions
abbas.fazal@siemens.com
Phone
+966 (3) 882 6506 Ext. 4229
+966 (50) 382 8409
+966 (50) 382 8409
Numbers We Feel Proud Of!
We aim for the best, we set it as our goal to make a change with our projects. Reach us today with your project goals and join hands to achieve excellence.
SATISFIED CLIENTS
0
PROJECTS COMPLETED
0
LAUNCHED PRODUCTS
0
Daily Visits
0